You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
github-actionsbot
changed the title
[Bug] [Module Name] 复制的工作流,逻辑节点switch丢失流转关系
[Bug] [Module Name] In the copied workflow, the logical node switch loses the flow relationship
Dec 18, 2024
I had searched in the issues and found no similar issues.
What happened
When copying a workflow with a logical node switch, the flow relationship of the logical node in the copied workflow is lost, and you need to manually configure the flow relationship. It's acceptable if the volume is small, but when there are hundreds or thousands of workflows, it becomes more troublesome.
What you expected to happen
There is a problem with front-end display
How to reproduce
When copying a workflow with a logical node switch, the flow relationship of the logical node in the copied workflow is lost, and you need to manually configure the flow relationship. It's acceptable if the quantity is small, but when there are hundreds or thousands of workflows, it becomes more troublesome.
Search before asking
What happened
当去复制一个拥有逻辑节点switch的工作流时,复制的工作流中逻辑节点的流转关系丢失,需要手动进去配置流转关系。如果量少还能接受,但当工作流成百上千时,就比较麻烦了。
What you expected to happen
前端展示存在问题
How to reproduce
当去复制一个拥有逻辑节点switch的工作流时,复制的工作流中逻辑节点的流转关系丢失,需要手动进去配置流转关系。如果量少还能接受,但当工作流成百上千时,就比较麻烦了。
Anything else
No response
Version
3.2.x
Are you willing to submit PR?
Code of Conduct
The text was updated successfully, but these errors were encountered: