Skip to content

πŸ’š Fix release CI #5

πŸ’š Fix release CI

πŸ’š Fix release CI #5

Triggered via push December 25, 2023 14:22
Status Failure
Total duration 32s
Artifacts

release.yml

on: push
Matrix: lint
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

8 errors
lint (3.8)
Process completed with exit code 2.
lint (3.9)
Process completed with exit code 2.
lint (3.10)
The job was canceled because "_3_8" failed.
lint (3.10)
Process completed with exit code 2.
lint (3.11)
The job was canceled because "_3_8" failed.
lint (3.11)
Process completed with exit code 2.
lint (3.7)
The job was canceled because "_3_8" failed.
lint (3.7)
The operation was canceled.