Skip to content

Prepare release test #2474

Prepare release test

Prepare release test #2474

Triggered via pull request December 5, 2024 16:15
Status Failure
Total duration 8m 19s
Artifacts

continuous-integration.yml

on: pull_request
Build dev Docker image with dev dependencies
6m 2s
Build dev Docker image with dev dependencies
Build dev Docker image
7m 30s
Build dev Docker image
Code Quality
42s
Code Quality
Lint Dockerfile
6s
Lint Dockerfile
Matrix: Run Tests
Run gRPC integration tests using standalone server
28s
Run gRPC integration tests using standalone server
Run gRPC integration tests using Docker containers
31s
Run gRPC integration tests using Docker containers
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Run Tests (3.9)
Process completed with exit code 2.
Run Tests (3.12)
The job was canceled because "_3_9" failed.
Run Tests (3.12)
The operation was canceled.
Run Tests (3.11)
The job was canceled because "_3_9" failed.
Run Tests (3.11)
The operation was canceled.
Run Tests (3.10)
The job was canceled because "_3_9" failed.