Prepare release test #2474
continuous-integration.yml
on: pull_request
Build dev Docker image with dev dependencies
6m 2s
Build dev Docker image
7m 30s
Code Quality
42s
Lint Dockerfile
6s
Matrix: Run Tests
Run gRPC integration tests using standalone server
28s
Run gRPC integration tests using Docker containers
31s
Annotations
6 errors
Run Tests (3.9)
Process completed with exit code 2.
|
Run Tests (3.12)
The job was canceled because "_3_9" failed.
|
Run Tests (3.12)
The operation was canceled.
|
Run Tests (3.11)
The job was canceled because "_3_9" failed.
|
Run Tests (3.11)
The operation was canceled.
|
Run Tests (3.10)
The job was canceled because "_3_9" failed.
|