Skip to content

synced from vm lib (#453) #234

synced from vm lib (#453)

synced from vm lib (#453) #234

Re-run triggered July 3, 2024 16:50
Status Success
Total duration 19m 19s
Billable time 16m
Artifacts 42

release.yaml

on: push
Check libraries
25s
Check libraries
Build charm  /  Collect bases for charm | .
16s
Build charm / Collect bases for charm | .
ci-tests  /  ...  /  Collect bases for charm | .
15s
ci-tests / Build charm / Collect bases for charm | .
ci-tests  /  ...  /  Lint .github/workflows/
6s
ci-tests / Lint / Lint .github/workflows/
ci-tests  /  ...  /  tox run -e lint
23s
ci-tests / Lint / tox run -e lint
ci-tests  /  Unit test charm
24s
ci-tests / Unit test charm
ci-tests  /  Check libraries
29s
ci-tests / Check libraries
Matrix: Build charm / build
Matrix: ci-tests / Build charm / build
Matrix: ci-tests / integration-test
Release charm  /  Release charm
1m 2s
Release charm / Release charm
Fit to window
Zoom out
Zoom in

Annotations

2 warnings
ci-tests / Unit test charm
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1
Release to Charmhub
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.

Artifacts

Produced during runtime
Name Size
logs-intergration-test-charm-microk8s-juju-3.4.3-amd64-high_availability-test_self_healing.py-group-1 Expired
21.1 KB