-
Notifications
You must be signed in to change notification settings - Fork 5
Timeline
Michail Chatzianastasis edited this page Aug 26, 2019
·
1 revision
Milestones at the end of each GSoC phase:
- Complete Database schema.
- Complete Models and Routes of the Backend system.
- API that supports the basic functionality of the system (student,supervisor register, topic creation, assign topic, submit topic).
- Register and Log in components in the frontend.
- Basic user-interface for student and supervisor.
- Partial documentation of the system
- Tests that checks if the backend works properly
- Functional user-interface and backend that supports all the roles of the TMS lifecycle
- Full documentation of the project
- Digital repository of completed thesis
- Integrated Chat between student and supervisor
- Tests