Timeline

Milestones at the end of each GSoC phase:

June 28, 2019 Phase 1 Evaluation:

  • Complete Database schema.
  • Complete Models and Routes of the Backend system.
  • API that supports the basic functionality of the system (student,supervisor register, topic creation, assign topic, submit topic).

July 26, 2019 Phase 2 Evaluation:

  • Register and Log in components in the frontend.
  • Basic user-interface for student and supervisor.
  • Partial documentation of the system
  • Tests that checks if the backend works properly

August 26, 2019 Final Evaluation:

  • Functional user-interface and backend that supports all the roles of the TMS lifecycle
  • Full documentation of the project
  • Digital repository of completed thesis
  • Integrated Chat between student and supervisor
  • Tests