Skip to content

Build and test FreeIPA containers #1019

Build and test FreeIPA containers

Build and test FreeIPA containers #1019

Re-run triggered December 25, 2024 07:31
Status Failure
Total duration 30m 31s
Artifacts 8

build-test.yaml

on: schedule
Matrix: Build image
Prerequisite for RHEL builds
0s
Prerequisite for RHEL builds
Matrix: Run with docker on Ubuntu 20.04 with hybrid cgroups
Matrix: Run with docker
Matrix: Run with K3s with docker
Matrix: Run with sudo podman 4
Matrix: Run with rootless docker
Matrix: Run with rootless podman 4
Matrix: Upgrade from older version or build on Ubuntu 20.04
Matrix: Upgrade from older version or build
Matrix: Upgrade from older version with podman 4
Matrix: Build and test RHEL image
Matrix: Push images to registries
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Upgrade from older version or build (fedora-rawhide, fedora-41)
Process completed with exit code 1.
Run with rootless docker (fedora-rawhide, --read-only)
Process completed with exit code 1.
Run with rootless docker (fedora-rawhide, --read-only)
Process completed with exit code 1.
Run with docker (fedora-rawhide)
Process completed with exit code 1.
Run with docker (fedora-rawhide)
Process completed with exit code 1.
Run with docker (fedora-rawhide, --read-only, --external-ca, freeipa-data)
Process completed with exit code 1.
Run with docker (fedora-rawhide, --read-only, --external-ca, freeipa-data)
Process completed with exit code 1.
Run with K3s with docker (fedora-rawhide)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 30 minutes.
Run with K3s with docker (fedora-rawhide)
The operation was canceled.
Prerequisite for RHEL builds
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636