Skip to content

More flexible versions. #282

More flexible versions.

More flexible versions. #282

Triggered via push September 3, 2024 01:00
Status Failure
Total duration 1m 7s
Artifacts

cicd.yml

on: push
Matrix: builds
Matrix: newer-builds
Matrix: older-builds
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Erlang 21 build (old)
Process completed with exit code 1.
Erlang 22 build (old)
The job was canceled because "_21" failed.
Erlang 22 build (old)
The operation was canceled.
Erlang 23 build (old)
The job was canceled because "_21" failed.
Erlang 23 build (old)
The operation was canceled.
Erlang 24 build
Process completed with exit code 1.
Erlang 26 build
The job was canceled because "_24" failed.
Erlang 26 build
Process completed with exit code 1.
Erlang 25 build
The job was canceled because "_24" failed.
Erlang 25 build
The operation was canceled.
Erlang 27 build
Process completed with exit code 1.